Chemical Dosing System – Phosphorous Removal at Beaudesert WWTP
Project Details
Client: Queensland Urban Utilities
Project: Installation of Chemical Dosing System for Phosphorous Removal at Beaudesert WWTP
Contract Value: $410,000
Completion: March 2014
Key Capabilities
Construct new access roadway, loading bay and 2,200 m3 bund
Install storage tank and Grundfos chemical dosing pumps
Supply and install safety shower and wash area with potable water connection
Install new switchboard with control systems near the PAC dosing point including running of electrical conduits for power/control cabling for the chemical dosing system
Manufacture and install a fully ventilated cover structure for the PAC storage and dosing pump area